Aniruddh Mohan
@aniruddh_mohan
PJM's next capacity auction (27/28) result is already coming up next week (!) and auction parameters show continued load growth + supply crunch expected
- Peak load up 3.3%
- Reliability requirement up 6.3 GW (4.3%) - will we be short?
- Load flexibility: sell side analysis says
- Peak load up 3.3%
- Reliability requirement up 6.3 GW (4.3%) - will we be short?
- Load flexibility: sell side analysis says
2 40